
Materials:
1 skein Patons Jet (81 yards)
US 9 double-pointed needles
scrap yarn
cable needle (optional)
tapestry needle
Gauge:
5 stitches x 5 rows in K1, P1 ribbing=1 inch
Terms:
C1B~Slip 1 stitch onto cable needle and hold to back of work
C2B~Slip 2 stitches onto cable needle and hold to back of work
C2F~Slip 2 stitches onto cable needle and hold to front of work
KC~K the stitch(s) on the cable needle
PC~P the stitch(s) on the cable needle
Left Hand:
CO 34
Work 8 rounds in K1, P1 ribbing
K 1 round
Rnd 10: K6, P1, C1B, K2, KC, P1, C1B, K2, PC, C2F, P1, KC, P1, C1B, K2, KC, P1, K12
[K6, P1, K3, P1, K2, P2, K2, P1, K3, P1, K12] for 3 rounds
Rnd 14: K6, P1, K3, P1, C2F, P1, KC, C1B, K2, PC, P1, K3, P1, K12
Rnd 15: K6, P1, C1B, K2, KC, P2, C2B, K2, KC, P2, C1B, K2, KC, P1, K12
Rnd 16: K6, P1, K3, P1, C1B, K2, PC, C2F, P1, KC, P1, K3, P1, K12
Repeat rounds 11-14
Rnd 21: *K6 with scrap yarn, K the same 6 stitches again with working yarn. Continue as for round 15.
Repeat round 16
Repeat rounds 11-16
Repeat rounds 11-14
BO loosely
Thumb:
*Note: This method is taken from Fetching.
Carefully unravel scrap yarn and place the 12 live stitches on two double-point needles. Attach yarn and pick up the 6 on the bottom, 1 from the side, the 6 on the top, and 1 from the other side. 14 stitches. Distribute onto 3 dpn's.
K 4 rounds
BO loosely
Right Hand:
CO 34
Work 8 rounds in K1, P1, ribbing
K 1 round
Rnd 10: K12, P1, C2F, K1, KC, P1, CIB, K2, PC, C2F, P1, KC, P1, C2F, K1, KC, P1, K6
[K12, P1, K3, P1, K2, P2, K2, P1 K3, P1, K6] for 3 rounds
Rnd 14: K12, P1, K3, P1, C2F, P1, KC, C1B, K2, PC, P1, K3, P1, K6
Rnd 15: K12, P1, C2F, K1, KC, P2, C2F, K2, KC, P2, C2F, K1, KC, P1, K6
Rnd 16: K12, P1, K3, P1, C1B, K2, PC, C2F, P1, KC, P1, K3, P1, K6
Repeat rounds 11-14
Rnd 21: Work 28 stitches as for round 15. *K6 with scrap yarn, K the same 6 stitches again with working yarn. Continue as for Round 15
Repeat round 16
Repeat rounds 11-16
Repeat rounds 11-14
BO loosely
Work thumb






9 comments:
Excellent mitts! I'm having a little trouble with the pattern, though.
On Round 10 of the Left Hand, I'm not coming out with 34 stitches. And on Round 15, you have "K6, P1, C1B, K12..." Is the "K12" a mistake?
Thanks,
Lizzie
Thank you for pointing that out! I have revised those two rows and you should be good to go. And if you find any other mistakes, don't hesitate to let me know!
Yours truly and happy knitting,
MJ
Hi, I have a question about row 21 for the right hand. It says to work 22 stitches and then make the thumb hole, but if you count out 22 stitches, you are in the midst of the pattern, and that doesn't make sense. did you mean 28 stitches?
Yes, thank you! I've made that correction to read 28 stitches.
On the 3x repeat for the right hand, it should have K6 after the P1 K3 P1 the second time. I loved making these, and it went rather quickly! Thanks! :)
Thank you for sharing the pattern - I used it as the basis for three pairs of mitts I knitted for male relatives this Christmas - you can see the first pair, and how I altered them, on my blog.
Happy New Year!
I'm a new knitter! HELP!!! I'm confused what happens between the "K 1 round" then all of sudden we are on to Rnd 10: instructions for cableing. what should be knitting from Round 2 to Round 9? knit the next 9 rounds???
The first eight rounds are knit in K1, P1 rib. "K 1 round" is Round 9. So the first cable row is Round 10.
Hope that clears things up!
(And thank to crankydragon for pointing out that error :P )
Yes, thank you, I'm off to finish the left side..right side will be a piece of cake
Post a Comment